Progression
The fixed distance a strip advances each stroke in a progressive die; equals the part pitch.
What it means on the floor
The progression (or pitch) is how far the feed moves the strip between strokes. It equals the spacing between identical features from one station to the next and sets how the part is distributed along the coil.
Progression, feed accuracy, and piloting together determine part-to-part registration and material utilization.
Category: Die Design
Using Progression in setup and quoting
Confirm how Progression is specified on your active part print, setup sheet, or tooling drawing before committing die clearances, press tonnage, or inspection limits. Browse shop-floor guides and Tool & Die 101 for worked examples — reviewed by Scott Bedow.